Cooling tower
Cooling tower
-
Client: Cooling tower
-
Project: Hansen gearbox
-
Work undertaken: overhaul, refurbishment at Brevini
On-site disassembly of fan to remove gearboxes
Hansen gearboxes returned to works for identification and inspection
Full refurbishment within a tight 2 day timescale
Return to site, refitted into tower
Pre-strip down
During strip-down
After overhaul