Installation of new drive system, Hull waste water treatment works
Installation of new drive system, Hull waste water treatment works
Project details
Client: | Hull Waste Water Treatment Works – Saltend |
Application: | Continuous stirring rake drive |
Problem: | Existing drive system obsolete & at ‘end of life’ |
Brief: | Select, manufacture & install new modern, efficient complete drive system |
Challenges: | Drive units in a bank of 4, with only 1 being allowed off-line at any time |
Existing drive arrangement
![](https://dana-sac.co.uk/wp-content/uploads/2019/02/Hull2-2.png)
Existing gearbox & access platform
![](https://dana-sac.co.uk/wp-content/uploads/2019/02/Hull3-2.png)
Replacement Drive Assembly
![](https://dana-sac.co.uk/wp-content/uploads/2019/02/Hull4.png)
![](https://dana-sac.co.uk/wp-content/uploads/2019/02/Hull7.png)
![](https://dana-sac.co.uk/wp-content/uploads/2019/02/Hull5.png)
![](https://dana-sac.co.uk/wp-content/uploads/2019/02/Hull6.png)
Installation
![](https://dana-sac.co.uk/wp-content/uploads/2019/02/Hull8.png)
![](https://dana-sac.co.uk/wp-content/uploads/2019/02/Hull9.png)
![](https://dana-sac.co.uk/wp-content/uploads/2019/02/Hull10.png)
![](https://dana-sac.co.uk/wp-content/uploads/2019/02/Hull11.png)
![](https://dana-sac.co.uk/wp-content/uploads/2019/02/Hull12.png)
![](https://dana-sac.co.uk/wp-content/uploads/2019/02/Hull13.png)