Steel works
Steel works
-
Client: Steelworks
-
Project: 28” worm drive from works
-
Work undertaken: general overhaul
Brought to works for inspection and refurbishment
Returned to site
Pre-strip down
After overhaul
Brought to works for inspection and refurbishment
Returned to site
Pre-strip down
After overhaul