Wind turbine main gearbox refurbishment
Wind turbine main gearbox refurbishment
Project details
Client: | Earthmill |
Application: | Main gearbox bearings, case bores, second – third line gearing line gearing |
Gearbox: | Schaeffer, helical gearing throughout |
Reported Problem: | Main gearbox failure |
Considerations: | Second line bearings were being overloaded leading to damage and ultimate gearbox failure |
Brief: | Strip and investigate, report, analysis of recovery options, refurbish with existing and new parts, test, paint and dispatch |
Results: | Refurbishment of worst damage at less than half the cost of a new unit. Combination of OEM gear parts and reverse engineered parts substantially reduced lead time. |